RSS
Service Before
Service Before
Detail Download Comment Image

Here is a shot of what my electric service entrance looked like before adding the generator components.  The new gas meter can be seen as well.

Service After
Service After
Detail Download Comment Image

A straight-on shot of the service panels with everything installed.  Notice the thin panel between the meter and the Generac transfer switch.  That's the main service disconnect box with a 150 amp breaker, and was required since I only have 150 amp service.  The transfer switch is capable of up to 200 amp service.

Service After
Service After
Detail Download Comment Image

A side-on shot of everything complete, including the upgraded natural gas meter.

 
 

 Rating

 

Rate this category

Rating: 0 / 0 vote

 Comments

 Statistics

 

Category

Number of published images in category: 3
Number of unpublished images in category: 0
Category Viewed: 3523 x

Most viewed images in category

Service Before
Service Before
Detail   1008 x
Service After
Service After
Detail   924 x
Service After
Service After
Detail   808 x

Last added images in category

Service After
Service After
Detail   30. 08. 2010
Service After
Service After
Detail   30. 08. 2010
Service Before
Service Before
Detail   30. 08. 2010
Powered by Phoca Gallery
   
© GregStenberg.com All Rights Reserved